Zoo progress pt. 2

topographical view of the zoo

 (Update progress 23 December 2022) More progress made on the paths and elevation of the exhibits, along with walls and some decorations. But the biggest change is the work done on the nocturnal building.

nocturnal building
Arial view of the nocturnal building and aviary.

nocturnal building close up
Close up of the nocturnal building.

interior of nocturnal building
Inside the nocturnal building next to what will be the glow squid and axolotl exhibits.

  (Update progress 28 December 2022) More progress on some exhibits.

unfinished aquarium
Aquarium, with the nocturnal building (and its roof) in background.

taiga exhibit
Taiga exhibit, foxes will go on the left, and wolves on the right.

forest and plains exhibit
Forest exhibit. Horses, cows and rabbits will go in this area.

  (Update progress 29 December 2022) Some more progress on the nocturnal building; its roof and internal pens.

arial view of nocturnal building
Arial view of the nocturnal building.

nocturnal building
Looking west at the nocturnal building. I'm waiting for the new bamboo block types in the next update to fill in the gaps around the top of the walls.

unfinished nocturnal hallway

Internal view of the ceiling beams.

darkened nocturnal hallway
Similar view as above, with the roof now in place it is significantly darker.

mangrove frog pen 1
The frog exhibit takes up nearly the entire south wall of the building, but it is divided into 5 separate sections (3 open air, and 2 submerged) that the frogs are free to move between.This is one of the mangrove swamp based sections.

submerged frog pen
One of the submerged sections.

snow frog pen
The central snow-based section. The frogs can climb up each snow wall to go into a submerged section.

mangrove frog pen 2
Another mangrove section.